87% of the Anthropic power will come from gas and 11% from coal in 2028
cross-posted from: lemmy.bestiver.se/post/1461022
87% of the Anthropic power will come from gas and 11% from coal in 2028
cross-posted from: lemmy.bestiver.se/post/1461022
The headline assumes AI adoption is going to got according to Anthropics own forecast. If you believe the AI companies hype about growth, then I think you should believe we’re about to have ‘AGI’ takeover the world, and you should have bigger concerns.
If you believe the bubble is about to pop, then conversely we’re about to see all these new gas power plants and datacenters go ~unused, and we’ve just seen a pretty big renewable buildout…
Huge bubble. First it was talking about data centers in orbit, now it’s the gross reality of gas turbines powering data centers. Either way, it’s not going to last much longer with the market crash.
This thing is pretty much the most insane thing to me.
These AI companies (Anthropic and OpenAI, along with the others there are trying to get in the game or are supplying their compute/datacenter): the basically have “unlimited money” right now and a very real PR problem…
Why the hell can’t they “pledge” to have 100% renewable energy, zero environmental impact (water, noise) data centers?
This isn’t a “it’s impossible” thing… of course it’s a ridiculous thing to claim in an absolute sense, but they could say and push for all data centers to be solar or whatever, have batteries or other environmental energy storage on-site, have closed-loop cooling, etc… but they don’t.
At the same time, the municipalities also aren’t really making this noise…l which goes to show how stupid and broken both sides of the system are. Why can’t the major metros and states (all blue, of course) say: no fucking data centers in California/Illinois… hell… Wisconsin, Michigan, Minnesota, etc. without proper sustainable designs?
It would cost nothing to the residents… the providers are basically playing in make-believe money land anyway… and the conversation is still about building data centers as if they are steel mills from the 1880s.
while we did see a blue wave, we currently have a fascist government model that favors the top 10 percent of consumers and the billionaires funding elections that pay off massively. Things can change quickly but we need to fix our government first. China has subsidized and taken the lead in renewable energy, The US has doubled down on burning shit and breaking things.
because everyone knew it’s a bubble from the very beginning. none of their tactics make sense in the long term, but there is no long term anyway, and in the short term externalising the costs gets the con going for a little longer
How much of that gas will be relatively efficient gas power plants with reasonable exhaust cleaning and how much of it will be gas turbines that are incredibly inefficient and dirty?
The KWK Donaustadt in Vienna has an efficiency of electricity and heat combined of 87%. What is the efficiency of a modern gas turbine?
Modern CCGTs emit around 0.34–0.40 tonnes CO₂/MWh. This is about half of OCGT and coal, but not nothing.
Practical it means they will install twice the power generation, not cut CO2 emissions.
bold of the authors to assume anthropic will consume any power in 2028 tbh
We can only hope. The best outcome might be for the first crop of AI companies to go extinct, and for their successors to be running modest models with lower power demands and a business model beyond “make sure someone else is holding the bag when we tank.” And/or for AI to become something people run locally as just another tool for specific purposes, once all the circular financing blows up and companies remember they can sell RAM and storage to regular people.
all of that is happening. although the dram cartel will have to be dragged kicking, but they will be, the massive amount of datacentre stuff pouring onto ebay won’t let them keep prices high.
There have been past occasions where companies preferred to destroy their stock rather than allow them to flood onto the used market and bring retail prices down. If we’re lucky, data centre hardware will arrive on eBay etc., but if we’re unlucky and the logic of late-stage capitalism wins, it will be shredded and thrown into landfill.
This will go over well in the winter.
Isn’t the future amazing!