RE: https://flipboard.com/@cbcnews/top-stories-01r3k2ttz/-/a-hsmSYgzgTviG8UEg2qQ1EQ%3Aa%3A107108217-%2F0
Once Hydro Québec confirmed it will start to need to import by 2029 due to insiufficient production, you'd think the Québec politicians would have stopped stalling and signed the bloody deal to get construction going at a fast pace.
N.L. premier waiting to hear from Quebec on Churchill River power deal
https://www.cbc.ca/news/canada/newfoundland-labrador/nl-churchill-river-9.7424046?utm_source=flipboard&utm_medium=activitypub
@jfmezei Possibly this is the sort of long-term plan that a government shouldn't sign just before an election. Did the PQ have an opinion on it?
#polqc