We are at the "turning off the power" stage of the boiler replacement, so we are running at Business Continuity Level 3, having switched over to the generator.
So far, business is continuing...
Discussion
We are at the "turning off the power" stage of the boiler replacement, so we are running at Business Continuity Level 3, having switched over to the generator.
So far, business is continuing...
@neil When we had ours done, we were told that power would go off.
A couple of hours in I asked when they would be doing the power off, only to be told they’d already done the work and wouldn’t need to touch the power.
We do not have a UPS or generator…
@psfshr Nice of them to wire it into your neighbour's supply :)
@neil always good to validate things work as needed though!
Wow. Just 13 minutes.
The UPSs alone probably would have been fine.