At 2am this week, my studio's AI coders had 10 open job slots and exactly zero jobs. My lead AI had finished its turn, done good work, and left nothing queued. So everybody slept, the work included.
0 Boosts
0 Likes
What the rules say now:
My lead AI fills every open slot on the coding bridge with real work before it ends a turn.
It queues the follow-up jobs too, chained so each starts when the one it needs is done.
The state of everything sits in one file that the next chat reads first, so nobody starts cold.
An empty bridge at the end of a turn is a miss, same as a failed test.
In the morning I look at the slot count.
Load the trays.
I'd asked for this once already, in a chat, and a chat isn't a rule. The empty slots were my miss. The machine behaved like an oven left hot all night with no trays in it.